Construction Site Diary

Journal

Update May 2026

Work on our site expansion is proceeding according to plan, and key construction phases have already been completed.

Initially, the roof drainage system was rerouted and supplemented with a drainage channel to ensure proper water flow during the construction phase and beyond. At the same time Shelf plate the hall floor was prepared for the future Shelf plate a crucial step for the upcoming construction work.

Significant changes have already become apparent in the CXS production area: Following the construction of a new partition wall, the existing exterior wall of the building was demolished. This has paved the way for the further development of the building area.

Structural fire protection is also taking shape. The foundation the new fire wall has been successfully poured, and the wall is currently being built.

In addition, work on the new office area is continuing. The construction of the foundations is currently in full swing and will serve as the basis for the next phases of construction.

With construction progressing as planned, the site expansion is taking shape—we will continue to provide regular updates on the latest developments.

 

Our construction site time-lapse video offers additional insight into the progress of the project :